Project: Shermnator   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:David Sherman   -  
Project:   Vans - RV-9A   -   VIEW REPORTS
Total Hours:538.25
Start/Last Date:Dec 12, 2020 - Jun 01, 2025
Engine:Lycoming O-320 D2A
 
Friendly URL: https://eaabuilderslog.org?s=Shermnator

Home or Last Project Picture

Sep 06, 2021     Left Elevator Done - (20 hours) Category: Empennage
After learning of the long lead time on my wing kit, I wasn't in too much of a hurry to complete the left elevator and the trim tab. It wasn't difficult, but I did have to torque the control horn as I riveted the skin to the trim tab spar. I have a little bit of flex in the skin of the elevator. Our local EAA build advisor said it was fine and that he hard a little of that on his RV-6. Not sure where some of the tolerances built up.
 